A couple of sources indicate that for ship building the materials are roughly half the costs and the labor and overheads are roughly half the cost. This means that we could estimate the costs as simply twice the steel cost. If steel is $1/kg and our structure is 500,000 kg, then a materials cost of $500,000 and a total cost of $1,000,000 could be estimated.