File:Fdseastead-build-step 005.png

From Seasteading
Jump to: navigation, search
Original file(1,000 × 700 pixels, file size: 323 KB, MIME type: image/png)

Hard artificial island construction: step 5, the structure is floated away. The cavity may be closed and the water pumped out for another construction cycle.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current11:14, 4 December 2008Thumbnail for version as of 11:14, 4 December 20081,000 × 700 (323 KB)Jesrad (talk | contribs)Hard artificial island construction: step 5, the structure is floated away. The cavity may be closed and the water pumped out for another construction cycle.
  • You cannot overwrite this file.

The following page links to this file: