Revision history of "File:Fdseastead-build-step 005.png"

Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 11:14, 4 December 2008Jesrad (talk | contribs). . (157 bytes) (+157). . (Hard artificial island construction: step 5, the structure is floated away. The cavity may be closed and the water pumped out for another construction cycle.)