Revision history of "File:Fdseastead-build-step 002.png"

Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 11:06, 4 December 2008Jesrad (talk | contribs). . (244 bytes) (+244). . (Hard artificial island construction: step 2, pouring down the concrete. Because of the crazy amount of concrete needed this process is slow and takes days if not weeks, so the entire thing is already curing from the bottom to the top all along.)