Difference between revisions of "Cost estimation"

From Seasteading
Jump to: navigation, search
({{The Market}})
Line 1: Line 1:
 
 
==Steel ship cost estimation==
 
==Steel ship cost estimation==
  
Line 17: Line 16:
 
* [http://www.seasteading.org/interact/forums/community/general-chat/used-ships Used Ships]
 
* [http://www.seasteading.org/interact/forums/community/general-chat/used-ships Used Ships]
 
* [http://www.seasteading.org/interact/forums/community/general-chat/retailers-and-manufacturers-are-our-friends How to contact retailers]
 
* [http://www.seasteading.org/interact/forums/community/general-chat/retailers-and-manufacturers-are-our-friends How to contact retailers]
 +
 +
{{The Market}}

Revision as of 04:48, 9 September 2008

Steel ship cost estimation

A couple of sources indicate that for ship building the materials are roughly half the costs and the labor and overheads are roughly half the cost. This means that we could estimate the costs as simply twice the steel cost. If steel is $1/kg and our structure is 500,000 kg, then a materials cost of $500,000 and a total cost of $1,000,000 could be estimated.

This sort of shipyard estimate does not include design costs. It is also just for the structure. Any solar power, engines, kites, sea anchors, furniture, electronics, etc are not part of this. It is also based on large ships. The shipyards overheads will be a higher percentage for a small vessel.

Links to plate steel prices for ship building

Links to ship cost estimation

Other links


The Market
Other projects and organisations · Seastead ventures · Publicity · Cost estimation · Suppliers · Training · Prizes