Difference between revisions of "User:Vincecate/Todo"
(→Test tiling idea for WaterWalker) |
|||
Line 19: | Line 19: | ||
==Test tiling idea for WaterWalker== | ==Test tiling idea for WaterWalker== | ||
− | I could build several WaterWalkers and try connecting them together to verify the tiling plan. | + | I could build several WaterWalkers and try connecting them together to verify the tiling plan. Ordered some extra foam balls so I could make two more WaterWalkers, for a total of 3. Could be interesting. |
Revision as of 16:13, 29 October 2008
Some things I might get around to doing sometime:
Contents
Measure Accelerations in my boat
Measure Gs of acceleration in my boat during different wave conditions to get an idea of how many Gs is OK and how much starts to bother people. Might just read some studies but since I will soon have a "G Data Logger" this should be easy enough. Could try it above deck and also below deck.
Measure force to move models
Measure force needed to move models at 1/5 MPH and 2/5 MPH to simulate 1 and 2 MPH.
Nice video when new camera comes
When new camera comes get some nice video of models in the sea. Probably try replacing the balls on the WaterWalker with something else too.
Test tiling idea for WaterWalker
I could build several WaterWalkers and try connecting them together to verify the tiling plan. Ordered some extra foam balls so I could make two more WaterWalkers, for a total of 3. Could be interesting.