File:Fdseastead-build-step 005.png
Size of this preview: 800 × 560 pixels. Other resolutions: 320 × 224 pixels | 1,000 × 700 pixels.
Original file (1,000 × 700 pixels, file size: 323 KB, MIME type: image/png)
Hard artificial island construction: step 5, the structure is floated away. The cavity may be closed and the water pumped out for another construction cycle.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 11:14, 4 December 2008 | 1,000 × 700 (323 KB) | Jesrad (talk | contribs) | Hard artificial island construction: step 5, the structure is floated away. The cavity may be closed and the water pumped out for another construction cycle. |
- You cannot overwrite this file.
File usage
The following page links to this file: