Difference between revisions of "File:Fdseastead-build-step 002.png"

From Seasteading
Jump to: navigation, search
(Hard artificial island construction: step 2, pouring down the concrete. Because of the crazy amount of concrete needed this process is slow and takes days if not weeks, so the entire thing is already curing from the bottom to the top all along.)
 
(No difference)

Latest revision as of 11:06, 4 December 2008

Hard artificial island construction: step 2, pouring down the concrete. Because of the crazy amount of concrete needed this process is slow and takes days if not weeks, so the entire thing is already curing from the bottom to the top all along.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current11:06, 4 December 2008Thumbnail for version as of 11:06, 4 December 20081,000 × 700 (488 KB)Jesrad (talk | contribs)Hard artificial island construction: step 2, pouring down the concrete. Because of the crazy amount of concrete needed this process is slow and takes days if not weeks, so the entire thing is already curing from the bottom to the top all along.
  • You cannot overwrite this file.

The following page links to this file: