Difference between revisions of "File:Fdseastead-build-step 005.png"
(Hard artificial island construction: step 5, the structure is floated away. The cavity may be closed and the water pumped out for another construction cycle.) |
(No difference)
|
Latest revision as of 11:14, 4 December 2008
Hard artificial island construction: step 5, the structure is floated away. The cavity may be closed and the water pumped out for another construction cycle.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 11:14, 4 December 2008 | 1,000 × 700 (323 KB) | Jesrad (talk | contribs) | Hard artificial island construction: step 5, the structure is floated away. The cavity may be closed and the water pumped out for another construction cycle. |
- You cannot overwrite this file.
File usage
The following page links to this file: