File list
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | User | Description | Versions |
---|---|---|---|---|---|---|
13:26, 2 November 2008 | Yleis.jpg (file) | 71 KB | Ajtaka | 3d-render of work in proces seastead lite model based on Andrew Houses engineer drawings. Made and rendered with Blender. By Ari Takalo (ajtaka). Under creative commons licence http://creativecommons.org/licenses/by-sa/3.0/ | 1 | |
07:54, 8 November 2008 | Pneumocell 5906.jpg (file) | 31 KB | Crasch | Thomas Herzig’s revolutionary architecture stands out for its modular and inflatable configuration. Resembling a cell (most functional part of all living organisms) this modular system works for small temporary buildings and will be marketed by Pneumoce | 1 | |
08:08, 8 November 2008 | Airdock.jpg (file) | 16 KB | Crasch | http://www.airisinflatables.com/ Introducing the revolutionary AirDock™ by Walker Bay®. Designed using Walker Bay's proprietary AirWeb™ High-Pressure Construction (patent pending), the AirDock provides a durable, versatile stable platform that is | 1 | |
08:34, 8 November 2008 | Alexis rochas fab pavilion.jpg (file) | 23 KB | Crasch | Imagine a home of the future that's portable, flexible -- and inflatable. Moving this structure to a new location would simply mean letting the air out and packing the flattened house into a car or truck. Fill an 18-inch cube with air and it becomes a | 1 | |
09:34, 8 November 2008 | Picture 11.png (file) | 604 KB | Crasch | http://www.core77.com/blog/object_culture/ny_design_week_2008_icff_inflate_9876.asp http://inflate.co.uk/i-structures-main.swf After graduating from the UK's Royal College of Art, industrial designer Nick Crosbie formed Inflate, a UK-based company that | 1 | |
09:47, 8 November 2008 | Picture 13.png (file) | 234 KB | Crasch | nflatable Roof for Heathrow Airport Central Bus Station, an order from National Express, was commissioned to Lindstrand Technologies by D5 architectural firm. The D5 proposal was radical, and was so asymmetrical that no two of its 3000 fabric panels were | 1 | |
10:40, 8 November 2008 | Jeddagymnasium.jpg (file) | 38 KB | Crasch | Exterior view of the gymnasium in Jeddah, Saudi Arabia, 1980 Designed by Otto Frei http://www.freiotto.com/FreiOtto%20ordner/FreiOtto/HauptseiteGross.html | 1 | |
10:45, 8 November 2008 | Arche-gonflable-2.jpg (file) | 11 KB | Crasch | http://co-creation.net/labo/architecture/livre-1-3.htm 2. les membranes soutenues par l'air (air supported structures en anglais) Cette fois, c'est la totalité de la membrane constituant la couverture du bâtiment (voire le bâtiment en entier lorsque | 1 | |
12:04, 8 November 2008 | Burlap7516.jpg (file) | 67 KB | Crasch | Here's a photo of the house before burlap: a ferrocement ring at the base, encasing steel studs, covered in stock panels. http://www.annesleyphoto.com/Building/ferroring7511.jpg Here's the structure from another angle, partly covered in burlap-crete. htt | 1 | |
12:06, 8 November 2008 | Ferroring7511.jpg (file) | 88 KB | Crasch | Here's a photo of the house before burlap: a ferrocement ring at the base, encasing steel studs, covered in stock panels. http://www.annesleyphoto.com/Building/ferroring7511.jpg Here's the structure from another angle, partly covered in burlap-crete. htt | 1 | |
12:06, 8 November 2008 | Clothespins7517.jpg (file) | 134 KB | Crasch | 1 | ||
17:02, 8 November 2008 | ThreeBarrels.JPG (file) | 142 KB | Vincecate | Three Barrels | 1 | |
17:03, 8 November 2008 | BeamOnRoof.JPG (file) | 113 KB | Vincecate | 1 | ||
19:44, 8 November 2008 | WoodTest.JPG (file) | 162 KB | Vincecate | 1 | ||
19:45, 8 November 2008 | SteelTest.JPG (file) | 160 KB | Vincecate | 1 | ||
18:39, 24 November 2008 | Waterwalkerwalker.JPG (file) | 5 KB | Joep | 1 | ||
11:00, 4 December 2008 | Fdseastead-build-step 001.png (file) | 452 KB | Jesrad | Hard artificial island construction: step 1, laying down the iron rebar, fiberglass or plastic or foam buoyancy, pipes and other infrastructure elements inside the cavity. | 1 | |
11:06, 4 December 2008 | Fdseastead-build-step 002.png (file) | 488 KB | Jesrad | Hard artificial island construction: step 2, pouring down the concrete. Because of the crazy amount of concrete needed this process is slow and takes days if not weeks, so the entire thing is already curing from the bottom to the top all along. | 1 | |
11:11, 4 December 2008 | Fdseastead-build-step 003.png (file) | 360 KB | Jesrad | Hard artificial island construction: step 3, the entire structure is set (details are not shown here). | 1 | |
11:12, 4 December 2008 | Fdseastead-build-step 004.png (file) | 369 KB | Jesrad | Hard artificial island construction: step 4, the cavity is opened and the sea surrounds the structure to lift it up. | 1 | |
11:14, 4 December 2008 | Fdseastead-build-step 005.png (file) | 323 KB | Jesrad | Hard artificial island construction: step 5, the structure is floated away. The cavity may be closed and the water pumped out for another construction cycle. | 1 | |
12:55, 16 December 2008 | Breakwater001.jpg (file) | 112 KB | Vtoldude | 1 | ||
14:44, 16 December 2008 | Powerfluctuations.png (file) | 7 KB | Christiaan | this system uses an airbubble instead of a battery. | 1 | |
17:10, 16 December 2008 | Tube breakwater.jpg (file) | 129 KB | Vtoldude | 1 | ||
20:17, 16 December 2008 | Floating base copy.png (file) | 13 KB | Christiaan | 1 | ||
20:18, 16 December 2008 | Side see through copy.png (file) | 11 KB | Christiaan | 1 | ||
20:18, 16 December 2008 | Raw map copy.png (file) | 23 KB | Christiaan | 1 | ||
23:10, 16 December 2008 | Breakwater turbine.jpg (file) | 94 KB | Vtoldude | 1 | ||
23:07, 18 December 2008 | Collector breakwater.jpg (file) | 117 KB | Vtoldude | 1 | ||
23:36, 18 December 2008 | Quarter pipe breakwater.jpg (file) | 124 KB | Vtoldude | 1 | ||
08:33, 19 December 2008 | Anti terror copy.png (file) | 11 KB | Christiaan | 1 | ||
09:21, 20 December 2008 | Flexibreak 002.png (file) | 589 KB | Jesrad | Variable-diameter floating breakwater made of vertical tubes for entrained water added mass. | 1 | |
09:22, 20 December 2008 | Flexibreak 001.png (file) | 650 KB | Jesrad | Variable-diameter floating breakwater: detail of expansion/contraction of the tubes ring. This also changes the effective width of the breakwater so it can be tuned to a variable range of ocean waves' frequencies. | 1 | |
09:24, 20 December 2008 | DHTMCsteads.png (file) | 590 KB | Jesrad | Double-hyperboloid multi-column seasteads. | 1 | |
14:19, 31 December 2008 | Diverting.JPG (file) | 7 KB | Joep | 1 | ||
19:35, 31 December 2008 | Vincemodel15a.jpg (file) | 77 KB | Vincecate | 1 | ||
19:36, 31 December 2008 | Vincemodel15b.jpg (file) | 97 KB | Vincecate | 1 | ||
19:52, 31 December 2008 | TesionMarinaBoats2.jpg (file) | 467 KB | Vincecate | 1 | ||
21:36, 31 December 2008 | TensionMarinaBoats1.jpg (file) | 104 KB | Vincecate | 3 | ||
21:38, 31 December 2008 | TensionMarinaBoats2.jpg (file) | 147 KB | Vincecate | 2 | ||
23:40, 4 January 2009 | WaterWalker2AmoniLR.JPG (file) | 115 KB | Vincecate | 1 | ||
01:45, 5 January 2009 | DynamicFrontPage.jpg (file) | 246 KB | Jhogan | Mockup of future seasteading.org front page: January, 2009 | 1 | |
23:14, 5 January 2009 | WaterWalker2flat.JPG (file) | 127 KB | Vincecate | 1 | ||
23:14, 5 January 2009 | WaterWalker2ropes.JPG (file) | 182 KB | Vincecate | 1 | ||
23:15, 5 January 2009 | WaterWalker2progress.JPG (file) | 157 KB | Vincecate | 1 | ||
23:16, 5 January 2009 | WaterWalker2Amoni.JPG (file) | 1.89 MB | Vincecate | Reverted to version as of 23:25, 4 January 2009 | 3 | |
23:16, 5 January 2009 | WaterWalker2Amoni2.JPG (file) | 142 KB | Vincecate | 1 | ||
22:44, 6 January 2009 | WaterWalker2VinceOnLand.JPG (file) | 3.82 MB | Vincecate | 1 | ||
22:47, 6 January 2009 | WaterWalker2MiguelKite1.JPG (file) | 2.3 MB | Vincecate | 1 | ||
22:49, 6 January 2009 | WaterWalker2KitePractice1.JPG (file) | 1.3 MB | Vincecate | 1 |