All public logs
Combined display of all available logs of Seasteading. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
- 19:31, 9 September 2009 Jesrad (talk | contribs) uploaded File:Artififloatisle07.jpg (Closer view of second model of artificial floating island. Configuration is very different, for very different uses of the buildable surface and storage room inside the hollowed out base.)
- 19:30, 9 September 2009 Jesrad (talk | contribs) uploaded File:Artififloatisle06.jpg (Another model of artificial floating island, this time with large aluminium support beams that can accomodate many smaller hanging structures (at the expense of wind drag coefficient for the entire seastead))
- 13:25, 7 September 2009 Jesrad (talk | contribs) uploaded File:Artififloatisland03.jpg (View of the house of artificial floating tropical island.)
- 13:23, 7 September 2009 Jesrad (talk | contribs) uploaded File:Artififloatisland05.jpg (Sunbathing on the artificial floating tropical island.)
- 13:23, 7 September 2009 Jesrad (talk | contribs) uploaded File:Artififloatisland04.jpg (Viw from top of observation tower of artifial floating tropical island.)
- 13:22, 7 September 2009 Jesrad (talk | contribs) uploaded File:Artififloatisland02.jpg (View from helipad of artificial floating tropical island.)
- 13:21, 7 September 2009 Jesrad (talk | contribs) uploaded File:Artififloatisland01.jpg (Far away view of the artificial floating tropical island.)
- 09:24, 20 December 2008 Jesrad (talk | contribs) uploaded File:DHTMCsteads.png (Double-hyperboloid multi-column seasteads.)
- 09:22, 20 December 2008 Jesrad (talk | contribs) uploaded File:Flexibreak 001.png (Variable-diameter floating breakwater: detail of expansion/contraction of the tubes ring. This also changes the effective width of the breakwater so it can be tuned to a variable range of ocean waves' frequencies.)
- 09:21, 20 December 2008 Jesrad (talk | contribs) uploaded File:Flexibreak 002.png (Variable-diameter floating breakwater made of vertical tubes for entrained water added mass.)
- 11:14, 4 December 2008 Jesrad (talk | contribs) uploaded File:Fdseastead-build-step 005.png (Hard artificial island construction: step 5, the structure is floated away. The cavity may be closed and the water pumped out for another construction cycle.)
- 11:12, 4 December 2008 Jesrad (talk | contribs) uploaded File:Fdseastead-build-step 004.png (Hard artificial island construction: step 4, the cavity is opened and the sea surrounds the structure to lift it up.)
- 11:11, 4 December 2008 Jesrad (talk | contribs) uploaded File:Fdseastead-build-step 003.png (Hard artificial island construction: step 3, the entire structure is set (details are not shown here).)
- 11:06, 4 December 2008 Jesrad (talk | contribs) uploaded File:Fdseastead-build-step 002.png (Hard artificial island construction: step 2, pouring down the concrete. Because of the crazy amount of concrete needed this process is slow and takes days if not weeks, so the entire thing is already curing from the bottom to the top all along.)
- 11:00, 4 December 2008 Jesrad (talk | contribs) uploaded File:Fdseastead-build-step 001.png (Hard artificial island construction: step 1, laying down the iron rebar, fiberglass or plastic or foam buoyancy, pipes and other infrastructure elements inside the cavity.)
- 12:53, 28 November 2008 Jesrad (talk | contribs) moved page Artifical Atoll to Artificial Atoll (Typo)
- 18:52, 14 September 2008 Jesrad (talk | contribs) uploaded File:Halvedstead02.jpg (Top view of HalvedStead, showing the tensegrity structure.)
- 18:51, 14 September 2008 Jesrad (talk | contribs) uploaded File:Halvedstead01.jpg (Distant view of a HalvedStead: the truss is approximately 31 meters tall.)